济南防水http://www.tianyujian.com/谈到隐蔽性的防水工程,最主要的是施工要做到细致入微。凿沟、坑、洞,要用防水砂浆修补好,穿管、地漏、卫生洁具的周边、阴、阳角和墙根为重点部位,要做成r角,刷防水素灰浆和抹防水沙浆时间不能超过30分钟。
1、济南防水介绍清理基面,注意不能有浮土,油污,洒水湿润,注意不得有积水。
Jinan waterproof introduce clean up the base surface, be careful not to have surface dust, oil, watering moist, attention may not have water.
2、济南防水谈到刷防水素灰浆,厚度2毫米,涂刷密实,抹防水砂浆,厚度13-19毫米,要抹平压实。
Speaking brush Jinan waterproof mortar waterproof elements, thickness 2 mm, dense brush, wipe waterproof mortar, the thickness of 13-19 mm, to smooth compaction.
3、济南防水http://www.tianyujian.com/分析施工20小时,要洒水养护,阳光直晒处要遮盖。
Analysis of Jinan waterproof construction 20 hours, to sprinkler maintenance, sunlight place to hide.