济南防水公司http://www.tianyujian.com/介绍一般情况下,保温部位现场实际情况较复杂,在设计图纸中很难详细表示,专业队伍必须绘出现场不同部位的保温节点大样图,报有关单位认可,方可展开施工。
1、济南防水公司谈到分格条施工不按要求开槽、镶贴造成渗、漏水,外保温墙面设置分格条主要为了克服保温墙面连续面积过大,在高、低温影响下容易开裂而采取的构造措施。应尽量减少分格条的设置,在分格条施工中应使用专用开槽器将保温板切成凹口,千万不能将EPS板切透,然后进行镶贴。
Jinan waterproof construction company comes to sub-riffles not required grooving, veneered cause seepage, leakage, external insulation wall set points riffles main wall insulation in order to overcome the continuous area is too large,at high and low temperature impact and easy to crack to take structural measures. Should minimize the sub-grid bar, and in the sub-riffles construction should use a dedicated slot insulation board will cut notches, do not cut through the EPS board, then veneered.
2、济南防水公司提醒在设计中,对于外保温在女儿墙顶或窗台处收口一般都不作特殊考虑,仅依赖保温施工反包口加强。但实际施工和使用中,上述部位经常会受到踩踏而破坏,从而造成渗、漏水。在上述部位外保温收口处建议做混凝土或用保温砂浆压顶,然后加强网格布反包、抗裂砂浆抹面。
Jinan waterproof Company cautions in the design, external insulation for her daughter at the top of the wall or windowsill generally do not shut up special consideration, insulation construction depends only strengthen the anti-bag
mouth. But the actual construction and use, these parts are often subject to trampling and destruction, resulting in seepage and leakage. In the above thermal shut at the site suggested a concrete or mortar capping insulation and
strengthen anti-mesh bag, cracking mortar surface.
3、济南防水公司建议外墙窗安装有先塞口和后塞口两种方法,在有外保温施工的外墙面,由于收口不实或固定窗框打眼,易造成渗、漏水。为保证外墙窗洞收口质量,减少渗漏点,可以采用后塞口施工,以加强对洞口施工质量的检查、控制。外墙窗安装时应避免在窗框下口框体上直接打眼固定。
Jinan waterproof recommends facades windows installed after the first receptacle and gagged the two methods, the outer insulation construction of outer walls, due to the shut false or fixed sash drill, could easily lead to seepage,leaks. Facades or windows shut in order to ensure quality, reduce leaks after construction can be used gagged, in order to strengthen checks on the quality of construction openings, control. Avoid exterior walls should be installed in the opening window frame sash direct drilling under fixed.
4、济南防水公司http://www.tianyujian.com/介绍后施工附墙雨水管、百叶窗、固定构件等造成渗、漏水,应在外保温施工前提前做。
Jinan waterproof construction after the company introduced rainwater pipes attached to the wall, shutters, fixing member caused by seepage, leakage, should be done in advance before the outer insulation construction.